World's Largest Suppliers of Containers, Shelters, etc.
About Us Shelter Oil & Gas Container Standard Accessories Uniteam ReliefNews
   
Expandable Shelters
High Mobility Camps

Tents

Protective Shelters
Medical Shelters
Tactical Shelters
Special Purpose Shelters
» Accomondation Prefab
» Accommodation Prefab Spec
» Offices
» Kitchen
» Canteen
» Laundry
» Sanitary
» Workshop Shelters
» Jail
» Schools
» Religious Shelter
» Sauna Shelter
» Pub Shelter
Environmental Systems

Accommodation Prefab Spec


Uniteam can provide prefabricated shelters and accommodation solutions in various combinations. We tailormake camps according to the customers requirements and needs.

THE BASIC 20-FOOTT ACCOMMODATION SHELTER - GENERAL DESCRIPTION

Our 20' ISO shelters comply fully with the ISO 20' size. Due to logistical considerations, our solutions is based on 10', 20' and 30' ISO dimensioned containers. Basically 20' (LxW= 6058mmx2438mm), which can be connected together to form larger facilities. Uniteam has delivered complete military camps for air force squadrons and army units, which have been deployed in Europe and Asia. Solutions from Uniteam consist of accommodation-, sanitary-, kitchen-, dining-room-, training room-, church-, living room-, reefer-containers, etc.
Exterior- and interior walls and panels are interchangeable in order to allow easy change of configuration to meet new requirements.

We have produced and delivered these shelters to several European armed forces, the United Nations, NGOs and for commercial purposes. The shelters are commonly used for living quarters, ablutions, kitchens, medical facilities, recreational facilities, dining halls, Command Posts, storage functions and workshops. The Module Shelter is field proven through many years of deployment around the world with various users..

The weight of the shelter is approximately 1800kgs.

The Shelters are ready for operation (insulated, lined, electrical system) IT and telephone cabling, heating and roof lighting depending on the customers demand.

Numerous options are available to tailor the shelters for most purposes.

Shelters may be carried on a DROPS-frame as flat-pack load and are then quickly erected on site.
Each unit will provide accommodation for 4 persons in one shared facility.

This module is constructed of a fully lined 20’ steel ISO container, erected on-site erection in approximately 8 hours, ready connected to services. As a prefabricated steel container there are no joints to leak, and with its DROPS capability, the shelter is movable, with an in-service life of at least 12 years. The shelter is fully CE marked.

The following description refers to the specification and furnishing of standard shelters.

UNITEAM Module-Shelters match ISO dimensions and have the advantages of this norm system. Construction is based on a stable frame and interchangeable wall panels.

The individual shelters can be stood either side-by-side or stacked on top of each other up to three floors. Individual sizes of space can be achieve by removing outer wall panels and fitting of partitions.

 

Standard measurements and weights of UNITEAM Module-Shelters:

Shelter Type Internal dimensions (mm) External dimensions (mm) Weights (kg)
MC 10’ – 2,3         1080
          1140
          1540
          1625
          1970
          2080
          2850
          3000

 


Length Width Height Length Width Height
2789 2235 2326 2989 2435 2591 1080
MC 10’ – 2,5 2789 2235 2500 2989 2435 2765 1140
MC 15’ – 2,5 4350 2235 2326 4550 2435 2591 1540
MC 15’ – 2,5 4350 2235 2500 4550 2435 2765 1625
MC 20’ – 2,3 5855 2235 2326 6055 2435 2591 1970
MC 20’ – 2,5 5855 2235 2500 6055 2435 2765 2080
MC 30’ – 2,3 8855 2235 2326 9025 2435 2591 2850
MC 30’ – 2,5 8855 2235 2500 9025 2435 2765 3000

UNITEAM Module-Shelters can also be delivered in dimensions which are exactly adapted to the individual use or to the available space.

SPECIFICATION DETAILS:

1) BASE:

Frame-construction: Cold rolled, welded, 3 mm steel profile; 4 welded (container) corner castings with dimensions according with ISO norms.
Floor: 22 mm chipboard, water resistant (V100), free of formaldehyde (E1); 1,5 mm synthetic floor covering (flash point class B1 - difficult to burn, smoke density Q1), welded seams; water soluble adhesive, environment friendly.
In sanitary shelters, the synthetic floor covering is laid to floor and approx. 100 mm up each wall all seams being welded. Additional strengthening is provided in the area where the boiler is positioned.
Floor base: 0,6 mm galvanised sheet metal.
Load bearing capacity: 2,50 kN/m², working load.
Insulation: 150 mm mineral-wool slabs (density 16 - 24 kg/m³; flash point class A - not flammable; smoke density class Q1-low smoke emission, in accordance with ÖNORM B 3800).

1 Floor – cross member 7 Insulation – mineral wool 100mm
2 Insulation – mineral wool 150mm 8 PVC – floor capping, two-piece
3 Chipboard 22 mm, V100, (E1) 9 Screw 4,0x20 mm
4 Sheet metal, galvanised, 0,6 mm 10 Chipboard screw 4,8x38 mm
5 PVC floor covering 1,5 mm, B1Q1 11 Screw 4,0x10 mm
6 Panel – covering profile, punched

2) ROOF:

Frame construction: 3mm welded steel profile; 4 (welded) container castings, dimensions in accordance with ISO norms, wooden perlins.
CEE connection: Sunken in frontal roof frame
Roof covering: 0,6 mm galvanised sheet metal, double folded along whole shelter length
Load bearing capacity: 1,00 kN/m²
Roof covering/interior: 10 mm chipboard overlaid both sides; colour: white; V20 quality, free of formaldehyde (E1)
Insulation: 100 mm mineral-wool slabs (density 16 - 24 kg/m³). To avoid cold bridges, the also the roof frame is insulated with mineral-wool slabs (density 16 - 24 kg/m³)
K-value: 0,3 W/m²K.


1 Frame profil with roof rail 8 Panel anchoring clip (upper part)
2 Wooden purlin 9 Panel anchoring clip (lower part)
3 Insulation - mineral wool 100mm 10 Upper capping
4 Aluminium double scotch tape, 52 mµ 11 Screw 4,0x20 mm
5 Vapour seal, aluminium foil, 50mµ 12 Screw 5,0x50 mm
6 Chip board, overlaid , 8mm 13 Screw 4,0x20 mm
7 Insulation - mineral wool 100 mm


3) CORNER POSTS:

Profile: Cold rolled 4 mm steel profile, dimension 152/210 mm.
Fitting: The four corner posts are fitted with the base frame and the roof frame with a screwing. In this manner UNITEAM Module-Shelters are collapsible and can be transported in packages.
Drainage: Rainwater will be drained through four seamless PVC-downpipes which are fitted into the corner posts, Æ50 mm.
Insulation: To avoid cold bridges, the corner posts are insulated with mineral-wool slabs (density 16 - 24 kg/m³)

1 Steel profile ST 53 – 3 5 Insulation, mineral wool
2 Insulation – mineral wool 60 mm 6 Edge capping, chipboard overlaid
3 Cellular rubber sealing 3x15 mm 7 Screw 6,0x90 mm
4 PVC downpipe , seamless, NW 50 mm 8 Screw 4,0x35 mm


4) WALL PANELS:

Exterior cladding: profiled galvanised sheet metal, PVC overlaid, 0,6 mm.
Interior cladding: 8 mm or 10 mm chipboard, overlaid; design: white or light oak. V20, free of formaldehyde (E1).
Insulation: 100 mm mineral wool slabs (density 16-24 kg/m³).

Options:
Full panel: wide - 1145 mm
Door panel: with a fitted aluminium-door 960/2055 mm
Window panel: with a fitted PVC-window with rolled blind 896/1375 mm
Sanitary window panel: with a fitted PVC-window with a peep proofed unit 610/610 mm
Half panel: wide - 573 mm

1 Insulation – mineral wool 60 mm 3 Wooden frame 35x60 mm
2 Cellular rubber sealing 15x50 mm 4 PVC - capping

5) SURFACE PRESERVATION:

All steel profiles will be fully abrasive shot blasted and coated with a primer prior to assembling, all sheet metals will be hot-dipping zinc galvanised.

6) PAINTING/COATING:

Primer coating: Epoxyprimer 20 my
Top coating: Vynilacryl 110 my

All zinc galvanised sheet metals are PVC overlaid in standard colours.

7) WINDOWS.

Standard window: UPVC window frame 885 x 1370 mm, white, glazed with vacuum sealed unit. Single handed tilt and turn mechanism complete, plastic rolled blind with burglar-proof fixing and blind fastener.
Sanitary window: UPVC window frame 600 x 600 mm, white, glazed with vacuum sealed peep-proof unit. Single handed tilt mechanism and camouflage painting.

IMPORTANT: The vacuum sealed glazing units fitted to office and crew and sanitary shelters are suitable for use at altitudes from 0 or above 1.100 m, a pressure compensation must be undertaken.

8) EXTERIOR DOORS:

Galvanised steel frame 890 x 2055 mm door on aluminium hinges, aluminium door leaf with 40 mm insulation; internal clearance: 810 x 2000 mm.

9) INTERIOR DOORS:
veneered wooden door, can be hung to left or right opening door, 750 x 2000 mm.

10) PARTITION WALLS:

Frame: 60 mm environment-friendly impregnated wood
Veneer: 4 mm wood decor finish: white or light oak design.

11) STORM PORCH:

Corner vestibule approx. 600 x 1.000 mm, 60 mm wooden door to interior with steel frame or an interior curtain as an option.

12) ELECTRICAL INSTALLATION:

Electric cabling is concealed and in sanitary shelters in moisture resistant specification. All parts fulfil ÖVE/VDE norms, also other European norms can be supplied.

Technical data:
Voltage 220/380 V, 50 Hz
Exterior connection supplying accord to CEE-norm (=commission Electrotechnique Europeenne) sunken in the roof frame, 5 pole/32A or 3 pole/32A socket and plug 2 twin wall-sockets
1 light switch
2 single battens with fluorescent lamps 58 W
Distribution enclosure with: Residual current circuit breaker 40/4E-0,03 A
10 A circuit breaker (light)
16 A circuit breaker (electric heater)
16 A circuit breaker (wall-sockets)

Earthing:
1 galvanised strip iron earth electrode (25 x 4 mm ) with fastening.

it is the responsibility of the buyer/lessee to arrange for the Earthing installation on site.

13) PLUMBING:

Cold water supply:
Galvanized pipe fed through shelter wall, accumulator pressure 10 bar, proof pressure 15 bar.
Hot water supply:
By electric boiler - size subject to shelter type: 5 ., 80 l, 150 l or 300 litre capacity
IMPORTANT: Tanks are designed for a working pressure of 6 bar max. Higher water pressures will demand the fitting of a pressure reduction valve.
Foul water:
Collected in copper pipes (50 mm to 100 mm diam.) for discharge through the wall of the shelter into an authorised sewage network in accordance with local regulations governing disposal of foul water.

14) HEATING AND VENTILATION:
Heating by thermostatically controlled and/or temperature controlled electric radiators or electric fan heaters.

Mechanical air circulation via electric ventilators. Air conditioning can be supplied if required. Regular ventilation of the rooms has to be provided – a relative humidity of 70 % should not be exceeded.

15) SITING AND ERECTION:
Any individual shelter should always be mounted on either wooden or concrete foundation bearers (6bearers). The same applies to the combining of several UNITEAM Module-Shelters in a cluster where units must be positioned over concrete bearers or concrete slabs. Foundation parameters and frost depths would be subject to local demands and soil conditions. Level foundations are necessary for problem-free positioning and friction-free erection of any combination. For assembling please read the appropriate mounting instructions.

16) HANDLING:

With overhead rope, 60 ° (4 corners), forklift, container-lift.


Valid: Nov 2004 Technical alterations reserved


Uniteam module shelters match ISO dimensions and have the advantage of this standardized criterion. Construction is based on a stable frame and interchangeable wall panels in various types.

Accommodation Shelter

Single 20’ Module w/2 rooms

Typical interior – 5 Modules coupled

THE UNITEAM SOLUTIONS
Based upon different requirements from our customers, we are proud to present various solutions for the different types. All shelters are 20 foot containers.
Type A – Empty Shelter
The shelter is constructed with 2 ea windows, 1 ea exterior door, 1 ea electric heater 2000 KW and 1 ea AC and 2 ea interior roof light. See drawing.
During transportation the shelter will be transported flat packed. That means that 4 flat packed shelters on top of each other has the same outer measures as 1 standard ISO container

4 Flat packed shelters


Type B – Toilet Shelter
The shelter is constructed with 1 ea exterior door, 2 ea interior roof light, 6 ea toilets made of porcelain separated with walls and doors – all doors can be opened from the outside with special keys , 2 ea sanitary windows, 4 ea hot and cold water taps, 1 ea long sink made of fibre glass , 1 ea hot water boiler a 80 l, 3 ea double electric outlets, 1 ea electric heater 2000 KW, 1 ea AC and 1 ea ventilation fan.
The Toilet shelter will be transported assembled and fully equipped.
See Drawing.
Type C – Shower Shelter
The shelter is constructed with exterior door, 2 ea interior roof light, 2 ea sanitary windows, 6 ea shower cabinets made of fibre glass , 4 ea hot and cold water taps, 1 ea long sink made of fibre glass , 1 ea hot water boiler a 300 l, 3 ea double electric outlets, 1 ea electric heater 2000 kW 1 ea AC and 1 ea ventilation fan.
The Shower shelter will be transported assembled and fully equipped
See Drawing
Type D – Office Shelter
The shelter is constructed with 2 ea windows, 1 ea exterior door , 1 ea electric heater 2000 KW and 1 ea AC and 2 ea interior roof light. See drawing.
During transportation the shelter will be transported flat packed. That means that 4 flat packed shelters on top of each other has the same outer measures as 1 standard ISO container

Accommodation shelter
Type E/1 – Accommodation Shelter
The shelter is constructed with 2 ea windows, 1 ea exterior door , 2 ea interior doors, 2 ea electric heater 2000 KW and 2 ea AC and 2 ea interior roof light. Partition walls according to drawing.
See drawing.
During transportation the shelter will be transported flat packed. That means that 4 flat packed shelters on top of each other has the same outer measures as 1 standard ISO container
Type E/2 – Accommodation Shelter
The shelter is constructed with 2 ea windows, 1 ea exterior door , 1 ea electric heater 2000 KW and 1 ea AC and 2 ea interior roof light.
See drawing.
During transportation the shelter will be transported flat packed. That means that 4 flat packed shelters on top of each other has the same outer measures as 1 standard ISO container

design proposal for 100 men
General
In order to host 100 people in a camp our proposal is as follows.
The composing of various shelters will of course be based upon the customers demand, but we would like to propose the following solutions.

How many shelters do you need?
The different alternatives of composing the camp are based upon the duration of the stay.
For longer periods we do recommend option 1.
For medium periods up to 3 months we would recommend option 2 and for short period up to one month we would recommend option 3

Option 1
1 ea Type B Toilet Shelter approx 10 people pr toilet
1 ea Type C Shower Shelter approx 10 people pr shower.
25 ea Type D Office Shelter approx 4 people pr office.
50 ea Type E/1 Accommodation Shelter based upon that the working staff will have single rooms
See drawings in 4.6.

Option 2
1 ea Type B Toilet Shelter approx 10 people pr toilet
1 ea Type C Shower Shelter approx 10 people pr shower.
25 ea Type D Office Shelter approx 4 people pr office.
28 ea Type E/1 Accommodation Shelter which is based upon that 10 % of the staff will have single rooms and the rest 2 people pr room.
See drawings in 4.6.


Option 3
1 ea Type B Toilet Shelter approx 10 people pr toilet
1 ea Type C Shower Shelter approx 10 people pr shower.
25 ea Type D Office Shelter approx 4 people pr office.
17 ea Type E/2 Accommodation Shelter which is based upon that the working staff will be live 6 persons pr shelter. This is considered acceptable for shorter periods.

For all options be aware that the shelters can be stacked in 3 heights and by doing that you will save space on the ground. Be aware that you will need smoke detectors/ alarms and fire extinguishers.

Principal sketch of the camp construction

We would propose a dividing of the camp in 3 areas.

Office area as the outer area, sanitary and service functions placed in the middle and accommodation in the back.
By doing this you may simplify the infrastructure e.g. piping, electricity etc.

Additional products available from Uniteam International AS

Mess hall
Based upon the module shelter we construct a mess hall without interior walls.
See picture

Incinerator
Due to normal governmental regulations a mobile incinerator will be most useful.
This saves lot a logistic handling .
Sewage treatment
We do also provide sewage treatment where the output is clean water and powder that mixed with peat will become fertilizers.

Water Purification
Uniteam International AS has several types of water purification systems available. Our equipment can purify all types of water.
Power supply/ emergency power supply
In order to have a reliable source of power supply we offer automatic systems that can produce as well as secure a reliable power supply.

Containerized kitchens
Our containerized kitchens can be designed to support whatever amount of people who needs serving.

Reefers
In order to keep the best quality for food during storing we offer different kinds of Reefers (Freezers and refrigerators containers).

Production capacity/Delivery
Our estimated production capacity for is good and we will be able to produce up to 200 per month for each type A, D and E1/E/2 shelters.

Type B and C we will be able to produce in total 5-10 per day.

Start delivery will be at earliest 1 month after placing of contract.
For further details see Commercial offer.
Attachments – Drawings

Type A – Empty Shelter


Type B – Toilet Shelter

Type c – Shower Shelter

Type D – Office Shelter

Type E/1 – Accomodation Shelter 2-rooms
1-2 persons pro room in single beds or bunk beds

Type E/2 – Accommodation Shelter 1-room
6 people in 3 bunk beds

Principal sketch of the camp construction
Camp 100 men Option 1. No stacking in heights. Possible to stack in maximum 3 heights. Single rooms 2 rooms in each shelter.

Principal sketch of the camp construction

Camp 100 men Option 3. No stacking in heights. Possible to stack in maximum 3 heights. 6 men in each accommodation shelter.

Principal sketch of the camp construction

Camp 100 men Option 3. No stacking in heights. Possible to stack in maximum 3 heights. 6 men in each accommodation shelter.








     © 2004 UniTeam Holding AS. All rights reserved.
    Web Design, Search Engine Optimization, Search Engine Marketing by Usable Design India